What Brevard County's Save Our Indian River Lagoon grants pay for a sewer hookup or septic upgrade, who qualifies, which Merritt Island zones are getting sewer, and what waterfront buyers should ask.
Yes, many Merritt Island homeowners can. Brevard County's Save Our Indian River Lagoon program offers a Septic-to-Sewer (Quick Connects) grant of up to $24,000 for pumped connections or $12,000 for gravity connections, a Septic Upgrade grant of up to $20,000 where sewer is not available, and you must be approved before work starts.
Last updated November 19, 2026.
A lot of Merritt Island waterfront homes still run on septic, especially along the canals off Sykes Creek and the Banana River. If you own one, or you are shopping Merritt Island waterfront property for sale, the county's lagoon grants can change the math on a sewer hookup or a septic upgrade. Here is what the programs pay, who qualifies, how to apply, and what buyers should ask about before closing.
It is a voter approved Brevard County program, funded by a half-cent sales tax, that pays for projects to cut nitrogen and phosphorus pollution in the Indian River Lagoon.
According to Brevard County's Save Our Indian River Lagoon page, the program funds muck removal, restoration, and septic projects, with citizen oversight and annual audits. The original tax ran from 2017 through 2026. A ten year renewal was on the November 2026 ballot, and voters approved it on November 3, 2026, according to unofficial results. The renewed levy is set to run January 1, 2027 through December 31, 2036.
Septic is a big part of the plan because conventional systems are not built to remove nitrogen. The county's grant page says its nitrogen loading evaluation found each residential septic system can contribute 47 pounds of nitrogen per year to the lagoon.
The Quick Connects grant pays up to $24,000 when the connection needs a pump (force main, or gravity main with a pump) and up to $12,000 for a straight gravity connection with no pump.
The amount is prorated. Per the county's Save Our Indian River Lagoon Homeowner Grants page, the program pays $1,600 for each pound of nitrogen from your property that is kept out of the lagoon, up to those caps. You can look up your parcel's estimated nitrogen load on the county's Septic Mapper story map, or ask program staff.
| Grant program | What it pays for | Maximum |
|---|---|---|
| Septic-to-Sewer (Quick Connects) | Decommissioning the septic tank and connecting to central sewer | $24,000 with a pump, $12,000 gravity only |
| Septic Upgrade | Replacing a conventional system with an advanced treatment unit where sewer is not feasible | Up to $20,000 |
| Private Sewer Lateral | Repairing or replacing a damaged private sewer line or cleanout on a home already on sewer | $10,000 full replacement, $2,000 smaller repairs |
Eligible costs for a sewer connection include design, permits, inspections, materials, equipment, contract labor, and connection fees. Work under the foundation, other plumbing on the property, and your own labor are not covered, and anything above your approved amount is on you.
Registered owners of residential or commercial property in the Indian River Lagoon watershed in Brevard County can apply. Merritt Island sits between the Indian River and the Banana River, so the island is inside that watershed.
For the sewer grant, the key condition is availability. The county says owners should first contact their sewer provider to confirm service is available, because it depends on existing lines and the utility's capacity. Brevard County Utility Services (321-633-2091) is one of the providers the county lists, but confirm which utility serves your exact address. Our sister site's guide to Merritt Island water and sewer service by address walks through that check.
If sewer is not available and is not coming soon, the Septic Upgrade grant is the path. It helps pay to replace a conventional system with an advanced treatment unit, with the amount based on the property's estimated pollution through its drainfield.
Email [email protected] or call 321-633-2016 to request an application, then wait for written approval before any work begins.
Starting work before approval can cost you eligibility, so get the notice to proceed in hand first.
Several Merritt Island project zones are in construction, bidding, or design, according to the county's Sewer Projects page (updated as of September 1, 2026).
The county says design alone can take 12 to 36 months and construction 10 to 18 months depending on size, so a zone in design today may be years from a connection. The Septic Mapper shows zone boundaries by parcel. Statuses change, so check the current page rather than relying on this snapshot.
Yes. Under Section 381.00655, Florida Statutes, the owner of a working septic system must connect within 365 days after the sewer owner gives written notice that sewer is available.
The same statute requires the utility to give at least one year of advance notice of anticipated availability. That is why a grant matters: once a project reaches your street, the connection stops being optional, and the grant can cover much of the private side cost.
State law also limits new septic around the lagoon. Section 403.067, Florida Statutes bars new septic systems in a basin management action plan area where sewer is available, and on lots of one acre or less without sewer it requires systems that remove at least 65 percent of nitrogen. If you plan to rebuild or replace a system on a canal lot, expect those rules to apply.
Ask whether the home is on septic or sewer, whether it sits in a county project zone, and whether any grant work was started, approved, or finished.
Our waterfront septic and drainfield records guide covers the paperwork to request, and the lagoon and canal water quality guide explains how to read conditions behind a home. For flood questions on the same lots, see Does Merritt Island flood?
Septic versus sewer is one of the questions I want answered on a Merritt Island waterfront home before an offer goes in. My advice to buyers is to look the parcel up on the county's Septic Mapper early so you know whether a project is planned, and my advice to sellers who already have an availability notice is to apply for the grant early. A finished connection with clean paperwork is easier to explain to a buyer than an open question.
Brevard County's Quick Connects grant reimburses eligible owners up to $24,000 for pumped connections or $12,000 for gravity connections, at $1,600 per pound of nitrogen prevented, once sewer is available to the property.
Yes. The Septic Upgrade grant offers up to $20,000 to replace a conventional system with an advanced treatment unit when connecting to sewer is not feasible. You must apply and be approved before any septic work starts.
Section 381.00655, Florida Statutes, gives owners of working septic systems 365 days after written notice from the sewer provider that service is available. Utilities must also give at least a year of advance notice.
Contact the Save Our Indian River Lagoon program at [email protected] or 321-633-2016 for an application, and call your sewer provider, such as Brevard County Utility Services at 321-633-2091, to confirm availability.
What is a wind mitigation inspection in Florida? What the 2026 form checks, who signs it, how long it lasts, and why it matters...
Does Merritt Island flood? Parts can, from storm surge, heavy rain, and king tides. Check FEMA flood zones, Zone A evacuation, and elevation by...
Amendment 3 passed. Homestead nonschool exemption rises in 2027; second homes get a 5% assessment cap. What Merritt Island waterfront owners should know.
Talk it through
Tell me the address, the street, or what you are trying to figure out. I will tell you what I know, including the parts that might change your mind.